ENGIE – PARTANNA 2

Turnkey supply of 220kV Partanna 2 grid stations and 220/30 kV Substations for WF Elimi and PV Mazara (TP).

Location of the plant

Italy / Sicilia / Trapani

Voltage level

220kV

Value

>10M€

Contract Type

EPC Grid Connection

Customer:

Contract duration: 1,5 years

Application: Renewables

Peculiarity: Grid Station

 

The project involved the construction of two 220kV stations for the 38.5MW Elimi wind farm and the 66MWp Metora solar farm, commissioned by Engie together with the adjacent Terna grid station. All stations were supplied turnkey, with the supply of 220 / 30kV power transformers.