Contact us
Chiudi
SAET is available to answer your questions.
I confirm that I have read and understood the privacy policy and:

CONSORCIO PUNTA CATALINA

Turnkey supply of 345 and 138 kV stations in Punta Catalina – Bani (Dominican Republic).

Location of the plant

Dominican Republic / Bani

Voltage level

345 – 138 kV

Value

>10M€

Contract type

EPC Grid Connection

Customer: Consorzio Odebrecht-Technimont-Estrella

Durata del contratto: 2,5 years

 

The Odebrecht-Tecnimont-Estrella consortium, building the Punta Catalina thermoelectric plant (2x376MW), entrusted SAET with the turnkey project of the two 345kV and 138kV stations. The 345 kV station was designed in a 1 and a half circuit breaker configuration., two transformer bays (voltage 345/22 kV – power 425 MVA). The Protection and Control System is integrated with a SCADA system for each of the two SS. Commissioning was carried out exclusively by SAET personnel.